Tjernlund SS1R SideShot (Discontinued) with UC1 Universal Co Bedienungsanleitung Seite 13

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 12
ELECTRICAL WIRING OF SS1-R ON OIL EQUIPMENT
All wiring from the SS1-R to the appliance must be appropriate Class 1 wiring as follows: installed in rigid metal conduit, intermedi-
ate metal conduit, rigid non-metallic conduit, electrical metallic tubing, Type MI Cable, Type MC Cable, or be otherwise
suitably protected from physical damage.
PREPARATION FOR SYSTEM WIRING
Make sure all power is disconnected from the furnace before attempting to install the SS1-R. Failure to do so can cause electrical
shock resulting in personal injury or death.
INSTALLATION OF OIL SOLENOID VALVE (DIAGRAM P)
1. Apply pipe sealant to the Elbows and attach the Elbows to the valve in the positions shown.
2. Place the 1/2” Chase Nipple through the Cad Cell housing with the 7/8” Grounding Lockwasher on the outside of the housing
as shown below.
3. Thread the Chase Nipple into the valve passing the wires of the Valve through the Chase Nipple.
4. Connect one 8” Tube Assy. from the pump to the Valve and the remaining 8” Tube Assy. from the Valve to the Nozzle Line
paying attention to the direction of flow as shown.
5. Thread wires (two) from solenoid valve through Cad Cell housing of burner to the existing junction box.
WARNING: MAKE SURE THAT ALL POWER IS DISCONNECTED AND TURNED OFF COMPLETELY BEFORE PROCEED-
ING TO INSTALL THE SS1-R POWER VENTER. FAILURE TO DO SO COULD RESULT IN PERSONAL INJURY OR DEATH.
THE FOLLOWING INSTRUCTIONS PERTAIN ONLY TO RHEEM, RUUD, OR WEATHERKING "C" (-OBC-XXX, -OPC-XXX &
etc.) AND "D" MODEL OIL FURNACES (-OBD-XXX, -OPD-XXX and etc.)
1. All wiring from the SS1-R to the oil furnace must be appropriate Class 1 wiring as follows: installed in a rigid metal conduit,
intermediate metal conduit, rigid non-metal conduit, electrical metallic tubing, Type MI Cable, Type MC Cable, or be otherwise
suitably protected from physical damage while complying with the latest revision of the National Electric Code.
2. Four wires are to be installed from the oil furnace to the SS1-R Side Wall Vent System. In addition, the L1 (115V), Neutral, and
ground wires will also be attached from a nominal 115VAC power source.
3. Remove the screws that secure the primary control to the junction box.
For "C" series oil furnaces (-OBC-XXX, -OPC-XXX & etc.), the primary control module (Honeywell R8184-G) and junction box is
mounted directly to the burner.
On "D" series oil furnaces (-OBD-XXX, -OPD-XXX and etc.), the primary control module (Honeywell R8184-M) is located on the
main junction box mounted to the interior wall of the furnace.
4. For "C" series oil furnaces (-OBC-XXX, -OPC-XXX & etc.), drill a 1" diameter hole into the junction box side of the furnace,
allowing for adequate clearance from electrical components, (See diagram Q). Use caution when drilling into the furnace so
12
DIAGRAM P
DIAGRAM Q
Seitenansicht 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare