Tjernlund 950-2043 ND-1 Post Purge Burner Kit 8504004 Rev 01 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Ausrüstung Tjernlund 950-2043 ND-1 Post Purge Burner Kit 8504004 Rev 01 herunter. Tjernlund 950-2043 ND-1 Post Purge Burner Kit 8504004 Rev 0196 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 4
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTALLATION INSTRUCTIONS FOR ND-1 (950-2043) POST PURGE BURNER KIT
INSTALLATION OF RELAY AND JUNCTION BOX EXTENSION ON A BECKETT BURNER (DIAGRAM B)
1. NOTE: Install the junction box extension only after the wiring has been completed.
2. Rotate the junction box extension so that the relay locates to the front. (toward the cabinet door)
3. Align the junction box extension to the top of the existing burner motor junction box.
4. Insert and start the 2 1/2” sheet metal screws to locate the junction box extension to the existing junction box.
5. Install the R8184G primary control and tighten the 2 1/2” sheet metal screws.
Make sure all power is disconnected from the furnace/boiler before
attempting to install the ND-1. Failure to do so can cause electrical
shock resulting in personal injury or death.
INSTALLATION OF OIL SOLENOID VALVE ON A BECKETT
BURNER (SEE DIAGRAM A)
NOTE: The Solenoid Mounting “U” Bracket, 24” Conduit and fittings are
not necessary when mounting on a Becket Burner or burner
with knock-out on Cad Cell housing.
1. Apply pipe sealant to the Elbows and attach the Elbows to the Valve
in the positions shown.
2. Place the Chase Nipple through the cad cell housing with the 13/16”
Lockwasher on the inside of the housing.
3. Thread the Chase Nipple into the Valve passing the wires of the
Valve through the Chase Nipple.
4. Connect one 8” Tube Assy. from the pump to the Valve and the
remaining 8” Tube Assy. from the Valve to the nozzle line paying
attention to the direction of flow as shown.
5. Thread wires (two) from Solenoid Valve through cad cell housing of
burner to the existing junction box.
PLAN VIEW ISOMETRIC VIEW
DIAGRAM B
DIAGRAM A
TJERNLUND PRODUCTS, INC.
1601 Ninth Street • White Bear Lake, MN 55110-6794
PHONE (800) 255-4208 • (651) 426-2993 • FAX (651) 426-9547
Visit our web site • www.tjernlund.com
Seitenansicht 0
1 2 3 4

Inhaltsverzeichnis

Seite 1

INSTALLATION INSTRUCTIONS FOR ND-1 (950-2043) POST PURGE BURNER KITINSTALLATION OF RELAY AND JUNCTION BOX EXTENSION ON A BECKETT BURNER (DIAGRAM B)1.

Seite 2

Make sure all power is disconnected from the furnace/boiler beforeattempting to install the ND-1. Failure to do so can cause electricalshock resultin

Seite 3

ELECTRICAL WIRING CONNECTIONSThe electrical contact ratings for the Oil Solenoid Valve and the Relay are as follows:OIL SOLENOID VALVE: 0.115 Amps at

Seite 4 - 115V RELAY PART# 950-0695

REV. 1/96 Copyright © 1995 Tjernlund Products, Inc. All rights reserved. P/N 8504004SIDESHOT® OR HST-SERIES WIRED WITH BURNER MOTOR POST PURGE KITSI

Kommentare zu diesen Handbüchern

Keine Kommentare